Parking Lot Resurfacing and Remodeling

When patching stops keeping up, the lot needs a new surface. 1NSG Corp resurfaces and rebuilds parking lots across South Florida under Florida general contractor license CGC1536356.

Overlay or full reconstruction

An overlay puts new asphalt over a sound base and is the cheaper path when the failure is at the surface. If the base is pumping, holding water, or cracked through, an overlay will telegraph the same failures within a season. We core and look before recommending either.

Drainage first

Most Florida lots fail because water sits. Before new asphalt goes down we correct slope and low spots so the lot sheds water toward inlets instead of ponding in the drive aisles.

Phasing around tenants

We split the lot into sections so the property keeps operating. Access lanes stay open, and we sequence around delivery windows and peak hours.

We will core the lot, look at the base, and tell you honestly whether you need an overlay or a rebuild.

Frequently Asked Questions

How do we know if we need an overlay or a full rebuild?

We core the lot and look at the base. If the base is sound and the failure is at the surface, an overlay is the cheaper correct answer. If the base is pumping or holding water, an overlay will telegraph the same failures within a season.

Can the property stay open during the work?

Yes. We split the lot into phases so access lanes stay open, and we sequence around delivery windows and peak hours.

Why does drainage keep coming up?

Because most Florida lots fail from standing water, not traffic. If we resurface without correcting slope and low spots, the new asphalt fails the same way the old one did.

Back to Parking Lot Remodeling and Striping.